PIPE HANGER WITH LINING

PIPE HANGER WITH LINING | NAC-SUP Series

Vibration-Isolated Suspended Pipe Support | Ceiling & Overhead Mounting | DN15–DN200

The New Age Pipe Hanger with Lining is a professional-grade suspended support system designed for horizontal piping installations requiring vibration isolation and noise control. The integrated high-density EPDM rubber lining prevents metal-to-metal contact, reducing noise transmission up to 18 dB, eliminating thermal expansion chatter, and protecting pipe surfaces from wear. Ideal for HVAC chilled/hot water lines, plumbing distribution, drainage systems, and fire protection mains where acoustic performance and long-term reliability are critical.

Download PDF
Categories

Product Designation System

NAC-SUP-XXX | NAC = New Age Corporation | SUP = Suspended Pipe Hanger | XXX = Sequential size designation

Complete Technical Specifications

Specification Details Specification Details
Material (Clamp) Mild Steel (ES 138 / A36) Construction Two-piece clamp with EPDM insert
Lining Material EPDM high-density rubber Pipe Size Range DN15 to DN200 (½” to 8″)
Finish Options Electro-Galv / Hot-Dip / Plain Operating Temp -20°C to +110°C
Mounting Method Threaded rod (M8, M10) Noise Reduction Up to 18 dB
Rod Connection Top-mounted threaded bore Side Screw M6 (all sizes)
Installation Before or after pipe placement Standards Egyptian Code / MSS SP-58

Load Capacity & Support Spacing Guidelines

The following load capacities are based on a 3:1 safety factor for suspended horizontal piping using proper threaded rod and ceiling anchors in concrete.

Product Code Pipe Size Pipe OD Range (mm) Max Load Max Spacing Rod Size Side Screw
NAC-SUP101 ½” (DN15) 20–25 mm 460 kg 2.5 m M8 M6
NAC-SUP102 ¾” (DN20) 26–30 mm 460 kg 2.5 m M8 M6
NAC-SUP103 1″ (DN25) 32–36 mm 460 kg 2.8 m M8 M6
NAC-SUP104 1¼” (DN32) 38–43 mm 460 kg 3.0 m M8 M6
NAC-SUP105 1½” (DN40) 47–51 mm 460 kg 3.0 m M8 M6
NAC-SUP106 2″ (DN50) 60–64 mm 460 kg 3.0 m M10 M6
NAC-SUP107 2½” (DN65) 74–80 mm 570 kg 3.2 m M10 M6
NAC-SUP108 3″ (DN80) 82–92 mm 570 kg 3.5 m M10 M6
NAC-SUP109 4″ (DN100) 113–118 mm 600 kg 3.5 m M10 M6
NAC-SUP110 6″ (DN150) 168–172 mm 600 kg 3.5 m M10 M6
NAC-SUP111 8″ (DN200) 215–220 mm 950 kg 3.8 m M10 M6

Note: Spacing may vary based on fluid density, insulation weight, and code requirements. Consult Egyptian Mechanical Code Section 305 for water-filled systems. For steam or high-temperature applications, contact engineering team for guidance.

Dimensional Specifications

Code Pipe Size Clamp OD (mm) Clamp Width (mm) EPDM Thickness Weight (approx)
NAC-SUP101 ½” (DN15) 26–30 40 3 mm 280 g
NAC-SUP102 ¾” (DN20) 32–36 45 3 mm 320 g
NAC-SUP103 1″ (DN25) 38–42 50 3 mm 380 g
NAC-SUP104 1¼” (DN32) 44–48 55 3 mm 450 g
NAC-SUP105 1½” (DN40) 52–56 60 4 mm 520 g
NAC-SUP106 2″ (DN50) 66–70 70 4 mm 680 g
NAC-SUP107 2½” (DN65) 80–86 80 4 mm 820 g
NAC-SUP108 3″ (DN80) 94–100 90 4 mm 1.1 kg
NAC-SUP109 4″ (DN100) 120–126 110 5 mm 1.6 kg
NAC-SUP110 6″ (DN150) 176–182 160 5 mm 2.8 kg
NAC-SUP111 8″ (DN200) 224–230 200 5 mm 4.2 kg

Material & Finish Specifications

Steel Clamp Body

Finish Type Coating Specification Recommended Application
Electro-Galvanized (EG) 12–25 μm per ASTM B633 Indoor mechanical rooms, dry environments
Hot-Dip Galvanized (HDG) ≥55 μm per ASTM A153 High-humidity areas, coastal zones, outdoor-exposed piping
Plain (Uncoated) No coating Paint-ready or controlled environments

EPDM Lining Specification

  • Material: EPDM (Ethylene Propylene Diene Monomer) high-density rubber
  • Hardness: 65 ± 5 Shore A
  • Temperature Range: -20°C to +110°C
  • Properties: Water-resistant, ozone-resistant, thermal expansion-tolerant
  • Function: Vibration damping, noise reduction (up to 18 dB), anti-galvanic protection
  • Standards: ASTM D2000 compliant

Suspended Support Application

The Pipe Hanger with Lining is specifically designed for overhead horizontal piping systems, providing:

Primary Functions

  • Carries full suspended pipe weight plus fluid load via threaded rod connection
  • Eliminates metal-to-metal contact between clamp and pipe surface
  • Controls vibration transfer from pumps, chillers, and thermal expansion
  • Maintains continuous linear pipe alignment across long suspended runs

Key Performance Benefits

  • Noise Reduction: Up to 18 dB reduction in structure-borne vibration noise
  • Pipe Protection: EPDM lining prevents surface scoring, corrosion, and insulation damage
  • Thermal Flexibility: Rubber remains flexible during temperature cycling (-20°C to +110°C)
  • Installation Flexibility: Can be installed before or after pipe is in place (open clamp design)

Typical Installation Locations

  • Ceiling-mounted horizontal distribution mains
  • Long-span HVAC chilled water and hot water lines
  • Plumbing risers transitioning to horizontal branches
  • Fire protection sprinkler mains and standpipe feeds
  • Equipment room overhead piping and condensate drains

Application Selection Guide

System Typical Use Recommended Sizes Finish Critical Feature
HVAC Chilled Water Ceiling-mounted distribution DN50–DN150 Hot-Dip Galvanized Prevents condensation corrosion
HVAC Hot Water Heating system mains DN40–DN100 Hot-Dip Galvanized Thermal expansion isolation
Fire Protection Sprinkler mains, standpipes DN65–DN200 Hot-Dip Galvanized High load capacity, reliable grip
Plumbing (Cold) Potable water distribution DN25–DN65 Electro-Galvanized Acoustic comfort in occupied spaces
Plumbing (Drainage) Ceiling-mounted drain lines DN50–DN100 Electro-Galvanized Noise control during discharge
Process Piping Equipment rooms, plant areas DN25–DN80 Hot-Dip Galvanized Vibration isolation from pumps

Installation Requirements

Pre-Installation Checklist

  • Calculate total pipe weight: (pipe + insulation + fluid) × length between supports
  • Verify ceiling anchor capacity: minimum 3× calculated load per support point
  • Select proper rod size per load table (M8 for light loads, M10 for heavy)
  • Ensure EPDM temperature rating matches system operating temperature
  • Confirm clamp size accommodates pipe OD including any coating or tape

Installation Procedure

  1. Install ceiling anchor and threaded rod

Use concrete expansion anchors (5 MPa minimum substrate strength) or beam clamps rated for load
Rod length = ceiling height to pipe centerline + adjustment allowance

  1. Prepare pipe hanger assembly

Open clamp by removing side screw (M6)
Inspect EPDM lining for damage or contamination
Verify rod thread engagement (minimum 3 full threads into top bore)

  1. Position pipe in clamp

Lift pipe into position or open clamp around existing pipe
Center pipe in EPDM lining channel – ensure full 360° contact

  1. Close and secure clamp

Align clamp halves and insert M6 side screw
Tighten gradually in stages to avoid deforming EPDM lining
Recommended torque: 8–10 Nm for M6 side screw
CRITICAL: Do not overtighten – rubber should compress slightly but not extrude

  1. Verify alignment and load distribution

Check pipe alignment with laser level or string line
Adjust threaded rod length if needed for proper elevation
Confirm spacing matches design (see load capacity table)
Verify no pipe sag between support points

Why Specify New Age Pipe Hangers with Lining?

Advantage Benefit to Your Project
Integrated EPDM Lining Factory-installed rubber eliminates field cutting, ensures consistent performance across all hangers
18 dB Noise Reduction Meets acoustic comfort requirements in hospitals, hotels, offices without additional treatments
High Load Capacity Up to 950 kg per support point – handles heavy fire protection mains and fully-flooded lines
Wide Temperature Range -20°C to +110°C – suitable for chilled water, hot water, and ambient plumbing systems
Flexible Installation Open-clamp design allows installation on existing piping without disassembly
100% Egyptian Manufacturing 3–7 day delivery (Cairo/Giza), local technical support, competitive pricing vs. imports
Certified Galvanization Long service life in humid mechanical rooms and coastal environments

Product Comparison: When to Use Each Support Type

Feature Pipe Hanger w/ Lining Half Saddle Light Saddle
Mounting Ceiling (suspended) Wall (vertical only) Wall OR ceiling
Load Range 460–950 kg 35–350 kg 25–192 kg
Vibration Isolation ✓ EPDM lining ✗ Metal contact ✗ Metal contact
Noise Reduction Up to 18 dB None None
Typical Use Long horizontal runs, HVAC mains Wall risers, vertical distribution Light branch lines, conduit
Pipe Size Range DN15–DN200 DN15–DN150 DN15–DN100

Standards & Certifications

  • Egyptian Mechanical Code – Suspended support spacing, load calculations, hanger selection
  • MSS SP-58 – Pipe hanger types and geometry equivalence
  • ASTM B633 – Electro-Galvanized coating specification (12–25 μm)
  • ASTM A153 – Hot-Dip Galvanized coating specification (≥55 μm)
  • ASTM D2000 – EPDM rubber material specification
  • Egyptian Standard ES 138 – Mild steel material classification (equivalent to ASTM A36)
  • ISO 9001:2015 – Quality management system certification

Engineering Support

Technical Assistance:

  • Load calculation verification (pipe weight + fluid + insulation)
  • Support spacing recommendations per system type and code
  • Rod size selection and ceiling anchor specification
  • Acoustic performance calculations for noise-sensitive areas
  • Thermal expansion analysis and hanger placement
  • On-site installation guidance and troubleshooting

Response Time: Technical queries answered within 24 hours

After-Sales Support: Product issue resolution, installation assistance, fast replacement for defects

Custom Solutions: Special sizes, finishes, or EPDM grades available for unique project requirements

Support Limitations & Alternative Products

When NOT to Use Pipe Hanger with Lining

Steam lines above 110°C (EPDM temperature limit)
Vertical riser support (designed for horizontal suspended loads only)
Direct wall mounting (requires ceiling/overhead structure)
Oil or chemical exposure (EPDM may degrade – consult for alternatives)

Recommended Alternatives

For applications beyond this product’s scope:

  • Wall-mounted risers: Use Half Saddle (NAC-HS) or Light Saddle (NAC-LS)
  • High-temperature steam: Use unlined clamp hangers with insulation shields
  • Adjustable height support: Use clevis-type pipe hangers with threaded rod
  • Seismic-rated installations: Add sway bracing per local code requirements

Trusted on Major Projects

New Age Pipe Hangers with Lining are specified across Egypt’s most demanding infrastructure:

  • New Administrative Capital – Government district HVAC distribution
  • Opera House Complex – Acoustic-sensitive mechanical systems
  • Military Complex Projects – Fire protection and plumbing mains
  • New Giza Development – High-rise chilled water distribution
  • Upper Egypt Hospitals – Medical facility plumbing and HVAC
  • Industrial Plants – Process piping in manufacturing facilities

Trusted by leading contractors: Orascom Construction, Hassan Allam Holding, Arab Contractors

NEW AGE

Supporting What Builds the Future

100% Egyptian Manufacturing | ISO 9001:2015 Certified | Trusted by Egypt’s Top Contractors

Reviews

There are no reviews yet.

Be the first to review “PIPE HANGER WITH LINING”

Your email address will not be published. Required fields are marked *

Reviews

There are no reviews yet.

Be the first to review “PIPE HANGER WITH LINING”

Your email address will not be published. Required fields are marked *