{"id":2183,"date":"2025-08-18T15:25:58","date_gmt":"2025-08-18T15:25:58","guid":{"rendered":"https:\/\/new-ageco.com\/?post_type=product&#038;p=2183"},"modified":"2025-11-02T19:46:46","modified_gmt":"2025-11-02T19:46:46","slug":"riser-clamp","status":"publish","type":"product","link":"https:\/\/new-ageco.com\/ar\/product\/riser-clamp\/","title":{"rendered":"RISER CLAMP"},"content":{"rendered":"<h2><b>Technical Specifications<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Feature<\/b><\/td>\n<td><b>Details<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>Material<\/b><\/td>\n<td><span style=\"font-weight: 400\">Grade A36 Mild Steel (A572 Grade 50 available on request)<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Construction<\/b><\/td>\n<td><span style=\"font-weight: 400\">Two pre-formed steel bars with precision-drilled bolt holes<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Maximum Temperature<\/b><\/td>\n<td><span style=\"font-weight: 400\">Up to 343\u00b0C (650\u00b0F) continuous service<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Load Capacity Range<\/b><\/td>\n<td><span style=\"font-weight: 400\">450 kg to 3200 kg (varies by pipe size)<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Finish Options<\/b><\/td>\n<td><span style=\"font-weight: 400\">Electro-Galvanized (12-25\u03bcm), Hot-Dip Galvanized (55\u03bcm), Plain<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Bolt Specifications<\/b><\/td>\n<td><span style=\"font-weight: 400\">Grade 8.8 hex bolts included (M10 or M12 depending on size)<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Installation Method<\/b><\/td>\n<td><span style=\"font-weight: 400\">Floor-mounted, direct load transfer to structural elements<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Standards Compliance<\/b><\/td>\n<td><span style=\"font-weight: 400\">Egyptian Mechanical Code, NFPA 13\/14 compatible<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>Pipe Compatibility<\/b><\/td>\n<td><span style=\"font-weight: 400\">Steel pipe Schedule 40\/80, nominal sizes 1&#8243; to 8&#8243;<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2><b>Product Range &amp; Load Capacities<\/b><\/h2>\n<table>\n<tbody>\n<tr>\n<td><b>Product Code<\/b><\/td>\n<td><b>Pipe Size<\/b><\/td>\n<td><b>Pipe OD (mm)<\/b><\/td>\n<td><b>Max Vertical Load (kg)<\/b><\/td>\n<td><b>Bar Thickness (mm)<\/b><\/td>\n<td><b>Bolt Size<\/b><\/td>\n<td><b>Weight (kg)<\/b><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-25<\/b><\/td>\n<td><span style=\"font-weight: 400\">1&#8243; (DN25)<\/span><\/td>\n<td><span style=\"font-weight: 400\">33.4<\/span><\/td>\n<td><b>450<\/b><\/td>\n<td><span style=\"font-weight: 400\">6<\/span><\/td>\n<td><span style=\"font-weight: 400\">M10<\/span><\/td>\n<td><span style=\"font-weight: 400\">1.2<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-32<\/b><\/td>\n<td><span style=\"font-weight: 400\">1\u00bc&#8221; (DN32)<\/span><\/td>\n<td><span style=\"font-weight: 400\">42.1<\/span><\/td>\n<td><b>580<\/b><\/td>\n<td><span style=\"font-weight: 400\">6<\/span><\/td>\n<td><span style=\"font-weight: 400\">M10<\/span><\/td>\n<td><span style=\"font-weight: 400\">1.4<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-40<\/b><\/td>\n<td><span style=\"font-weight: 400\">1\u00bd&#8221; (DN40)<\/span><\/td>\n<td><span style=\"font-weight: 400\">48.2<\/span><\/td>\n<td><b>720<\/b><\/td>\n<td><span style=\"font-weight: 400\">8<\/span><\/td>\n<td><span style=\"font-weight: 400\">M10<\/span><\/td>\n<td><span style=\"font-weight: 400\">1.8<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-50<\/b><\/td>\n<td><span style=\"font-weight: 400\">2&#8243; (DN50)<\/span><\/td>\n<td><span style=\"font-weight: 400\">60.3<\/span><\/td>\n<td><b>900<\/b><\/td>\n<td><span style=\"font-weight: 400\">8<\/span><\/td>\n<td><span style=\"font-weight: 400\">M10<\/span><\/td>\n<td><span style=\"font-weight: 400\">2.1<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-65<\/b><\/td>\n<td><span style=\"font-weight: 400\">2\u00bd&#8221; (DN65)<\/span><\/td>\n<td><span style=\"font-weight: 400\">73.0<\/span><\/td>\n<td><b>1200<\/b><\/td>\n<td><span style=\"font-weight: 400\">10<\/span><\/td>\n<td><span style=\"font-weight: 400\">M12<\/span><\/td>\n<td><span style=\"font-weight: 400\">2.8<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-80<\/b><\/td>\n<td><span style=\"font-weight: 400\">3&#8243; (DN80)<\/span><\/td>\n<td><span style=\"font-weight: 400\">88.9<\/span><\/td>\n<td><b>1450<\/b><\/td>\n<td><span style=\"font-weight: 400\">10<\/span><\/td>\n<td><span style=\"font-weight: 400\">M12<\/span><\/td>\n<td><span style=\"font-weight: 400\">3.2<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-100<\/b><\/td>\n<td><span style=\"font-weight: 400\">4&#8243; (DN100)<\/span><\/td>\n<td><span style=\"font-weight: 400\">114.3<\/span><\/td>\n<td><b>1850<\/b><\/td>\n<td><span style=\"font-weight: 400\">12<\/span><\/td>\n<td><span style=\"font-weight: 400\">M12<\/span><\/td>\n<td><span style=\"font-weight: 400\">4.1<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-125<\/b><\/td>\n<td><span style=\"font-weight: 400\">5&#8243; (DN125)<\/span><\/td>\n<td><span style=\"font-weight: 400\">141.3<\/span><\/td>\n<td><b>2400<\/b><\/td>\n<td><span style=\"font-weight: 400\">12<\/span><\/td>\n<td><span style=\"font-weight: 400\">M12<\/span><\/td>\n<td><span style=\"font-weight: 400\">4.8<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-150<\/b><\/td>\n<td><span style=\"font-weight: 400\">6&#8243; (DN150)<\/span><\/td>\n<td><span style=\"font-weight: 400\">168.3<\/span><\/td>\n<td><b>2850<\/b><\/td>\n<td><span style=\"font-weight: 400\">15<\/span><\/td>\n<td><span style=\"font-weight: 400\">M12<\/span><\/td>\n<td><span style=\"font-weight: 400\">6.2<\/span><\/td>\n<\/tr>\n<tr>\n<td><b>NAC-RSC-200<\/b><\/td>\n<td><span style=\"font-weight: 400\">8&#8243; (DN200)<\/span><\/td>\n<td><span style=\"font-weight: 400\">219.1<\/span><\/td>\n<td><b>3200<\/b><\/td>\n<td><span style=\"font-weight: 400\">15<\/span><\/td>\n<td><span style=\"font-weight: 400\">M12<\/span><\/td>\n<td><span style=\"font-weight: 400\">7.5<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span style=\"font-weight: 400\">*Load capacities include 2:1 safety factor. Custom sizes available for special applications.<\/span><\/p>\n<h2><b>Construction &amp; Design Details<\/b><\/h2>\n<p><b>Clamp Assembly<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Bar Configuration:<\/b><span style=\"font-weight: 400\"> Two precision-formed steel bars creating pipe cradle<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Bar Dimensions:<\/b><span style=\"font-weight: 400\"> Width 50-80mm (varies by pipe size), length 150-250mm<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Bolt Pattern:<\/b><span style=\"font-weight: 400\"> Pre-drilled holes with \u00b10.5mm tolerance for perfect alignment<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Load Transfer:<\/b><span style=\"font-weight: 400\"> Direct bearing contact with structural floor or beam<\/span><\/li>\n<\/ul>\n<p><b>Structural Requirements<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Minimum Floor Capacity:<\/b><span style=\"font-weight: 400\"> 150% of maximum pipe load (concentrated load)<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Bearing Area:<\/b><span style=\"font-weight: 400\"> Minimum 100 cm\u00b2 contact with structural element<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Edge Distance:<\/b><span style=\"font-weight: 400\"> Minimum 75mm from slab edge or beam flange<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Access Clearance:<\/b><span style=\"font-weight: 400\"> 100mm minimum around clamp for installation\/maintenance<\/span><\/li>\n<\/ul>\n<p><b>Quality Features<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Precise Pipe Fit:<\/b><span style=\"font-weight: 400\"> Machined radius matches pipe OD with 1-2mm clearance<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Bolt Grade:<\/b><span style=\"font-weight: 400\"> High-tensile Grade 8.8 bolts included with each clamp<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Surface Preparation:<\/b><span style=\"font-weight: 400\"> Shot-blasted prior to galvanizing for superior adhesion<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Load Distribution:<\/b><span style=\"font-weight: 400\"> Designed bearing surface prevents stress concentration<\/span><\/li>\n<\/ul>\n<h2><b>Why New Age RISER CLAMP?<\/b><\/h2>\n<p><b>Floor-Mounted Stability System<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Engineered to transfer vertical pipe loads directly to structural elements. No hanger rods, no ceiling attachments, no load path complications\u2014just solid ground support.<\/span><\/p>\n<p><b>Egyptian-Made Structural Precision<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Manufactured at our Abu Rawash facility using precision forming and machining equipment. Every clamp maintains dimensional accuracy for consistent load transfer and installation.<\/span><\/p>\n<p><b>Professional Load Transfer Design<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Each size calculated for specific pipe weights plus contents, seismic loads, and thermal expansion forces. Engineers receive documented load paths for structural calculations.<\/span><\/p>\n<p><b>Code-Compliant Installation<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Meets Egyptian Mechanical Code requirements for vertical pipe support. Compatible with NFPA 13 and 14 sprinkler system installation standards.<\/span><\/p>\n<p><b>Complete Installation Package<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Includes Grade 8.8 bolts matched to clamp size and load requirements. Pre-drilled holes ensure proper bolt engagement and load distribution.<\/span><\/p>\n<p><b>Contractor-Proven Reliability<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Trusted in Egypt&#8217;s tallest buildings where vertical pipe support cannot fail. Used by top contractors in high-rise MEP installations.<\/span><\/p>\n<h2><b>Primary Applications<\/b><\/h2>\n<p><b>Fire Protection Riser Systems<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Supporting vertical sprinkler risers, standpipes, and fire pump discharge lines between floor levels in high-rise buildings.<\/span><\/p>\n<p><b>HVAC Vertical Distribution<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Chilled water risers, heating hot water lines, and condenser water piping in commercial buildings and residential towers.<\/span><\/p>\n<p><b>Plumbing Riser Support<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Domestic water supply and waste lines in multi-story buildings, especially at floor penetrations and equipment levels.<\/span><\/p>\n<p><b>Industrial Process Piping<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> Vertical runs in manufacturing facilities, power plants, and process industries where floor-mounted support is required.<\/span><\/p>\n<h2><b>Installation Requirements &amp; Procedures<\/b><\/h2>\n<p><b>Structural Prerequisites<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Floor Loading:<\/b><span style=\"font-weight: 400\"> Verify structural capacity for concentrated pipe loads<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Bearing Surface:<\/b><span style=\"font-weight: 400\"> Ensure flat, level contact area minimum 100 cm\u00b2<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Access Requirements:<\/b><span style=\"font-weight: 400\"> Maintain 100mm clearance for bolt tightening<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Pipe Preparation:<\/b><span style=\"font-weight: 400\"> Install pipe guides or sleeves at floor penetrations<\/span><\/li>\n<\/ul>\n<p><b>Professional Installation Steps<\/b><\/p>\n<ol>\n<li style=\"font-weight: 400\"><b>Position Verification:<\/b><span style=\"font-weight: 400\"> Place clamp at design elevation on structural element<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Pipe Alignment:<\/b><span style=\"font-weight: 400\"> Ensure vertical pipe is plumb and properly positioned<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Clamp Assembly:<\/b><span style=\"font-weight: 400\"> Place clamp around pipe at support point (typically below flange or coupling)<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Bolt Installation:<\/b><span style=\"font-weight: 400\"> Insert Grade 8.8 bolts through precision-drilled holes<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Torque Application:<\/b><span style=\"font-weight: 400\"> Tighten bolts to specified torque (see table below)<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Load Verification:<\/b><span style=\"font-weight: 400\"> Confirm direct bearing contact with structural element<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Final Inspection:<\/b><span style=\"font-weight: 400\"> Check pipe restraint and load transfer path<\/span><\/li>\n<\/ol>\n<p><b>Installation Torque Requirements<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>M10 Bolts:<\/b><span style=\"font-weight: 400\"> 40-50 Nm<\/span><\/li>\n<li style=\"font-weight: 400\"><b>M12 Bolts:<\/b><span style=\"font-weight: 400\"> 70-85 Nm<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Re-torque:<\/b><span style=\"font-weight: 400\"> Check bolts after initial loading period<\/span><\/li>\n<\/ul>\n<h2><b>Structural Integration Guidelines<\/b><\/h2>\n<p><b>Floor Slab Requirements<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Minimum Thickness:<\/b><span style=\"font-weight: 400\"> 150mm reinforced concrete slab<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Concentrated Load:<\/b><span style=\"font-weight: 400\"> Design for pipe weight plus 50% dynamic factor<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Reinforcement:<\/b><span style=\"font-weight: 400\"> Additional reinforcing may be required at support points<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Edge Distance:<\/b><span style=\"font-weight: 400\"> Maintain minimum 75mm from slab edges<\/span><\/li>\n<\/ul>\n<p><b>Steel Beam Mounting<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Flange Bearing:<\/b><span style=\"font-weight: 400\"> Direct contact with top flange of structural steel<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Beam Capacity:<\/b><span style=\"font-weight: 400\"> Verify beam can support concentrated loads<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Connection Details:<\/b><span style=\"font-weight: 400\"> May require additional plates or stiffeners<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Lateral Restraint:<\/b><span style=\"font-weight: 400\"> Consider lateral pipe movement and thermal expansion<\/span><\/li>\n<\/ul>\n<p><b>Load Path Verification<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Direct Transfer:<\/b><span style=\"font-weight: 400\"> Load path must be clear from pipe through clamp to structure<\/span><\/li>\n<li style=\"font-weight: 400\"><b>No Suspended Loads:<\/b><span style=\"font-weight: 400\"> Clamp must not hang from overhead elements<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Structural Analysis:<\/b><span style=\"font-weight: 400\"> Include clamp loads in structural design calculations<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Seismic Considerations:<\/b><span style=\"font-weight: 400\"> Account for seismic forces in high-seismic zones<\/span><\/li>\n<\/ul>\n<h2><b>Standards &amp; Code Compliance<\/b><\/h2>\n<p><b>Egyptian Standards<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Egyptian Mechanical Code:<\/b><span style=\"font-weight: 400\"> Pipe support spacing and load requirements<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Egyptian Building Code:<\/b><span style=\"font-weight: 400\"> Structural loading and safety factors<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Fire Safety Code:<\/b><span style=\"font-weight: 400\"> Requirements for fire protection system supports<\/span><\/li>\n<\/ul>\n<p><b>International References<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>NFPA 13:<\/b><span style=\"font-weight: 400\"> Sprinkler system installation standards<\/span><\/li>\n<li style=\"font-weight: 400\"><b>NFPA 14:<\/b><span style=\"font-weight: 400\"> Standpipe system requirements<\/span><\/li>\n<li style=\"font-weight: 400\"><b>ASME B31.1:<\/b><span style=\"font-weight: 400\"> Power piping support requirements<\/span><\/li>\n<li style=\"font-weight: 400\"><b>MSS SP-58:<\/b><span style=\"font-weight: 400\"> Pipe hangers and supports selection guide<\/span><\/li>\n<\/ul>\n<p><b>Quality Certifications<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Material Certificates:<\/b><span style=\"font-weight: 400\"> Mill test reports for steel grades<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Load Testing:<\/b><span style=\"font-weight: 400\"> Proof load verification for each size range<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Coating Standards:<\/b><span style=\"font-weight: 400\"> ASTM B633 (electro-galvanizing), ASTM A153 (hot-dip)<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Manufacturing Quality:<\/b><span style=\"font-weight: 400\"> ISO 9001:2015 certified production<\/span><\/li>\n<\/ul>\n<h2><b>What You Get<\/b><\/h2>\n<p><span style=\"font-weight: 400\">\u2713 <\/span><b>One Riser Clamp Assembly<\/b><span style=\"font-weight: 400\"> (two pre-formed steel bars)<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span><span style=\"font-weight: 400\"> \u2713 <\/span><b>Grade 8.8 Hex Bolts<\/b><span style=\"font-weight: 400\"> (size matched to clamp capacity)<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span><span style=\"font-weight: 400\"> \u2713 <\/span><b>Precision-Drilled Holes<\/b><span style=\"font-weight: 400\"> for perfect bolt alignment<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span><span style=\"font-weight: 400\"> \u2713 <\/span><b>Load Certification<\/b><span style=\"font-weight: 400\"> documenting maximum vertical capacity<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span><span style=\"font-weight: 400\"> \u2713 <\/span><b>Installation Guide<\/b><span style=\"font-weight: 400\"> with structural requirements and torque specifications<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span><span style=\"font-weight: 400\"> \u2713 <\/span><b>Technical Support<\/b><span style=\"font-weight: 400\"> for load calculations and structural integration<\/span><\/p>\n<h2><b>Application Examples &amp; Case Studies<\/b><\/h2>\n<p><b>High-Rise Sprinkler Riser<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Building:<\/b><span style=\"font-weight: 400\"> 15-story residential tower<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Application:<\/b><span style=\"font-weight: 400\"> 6&#8243; fire riser support at mechanical levels<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Product:<\/b><span style=\"font-weight: 400\"> NAC-RSC-150 with hot-dip galvanized finish<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Load:<\/b><span style=\"font-weight: 400\"> 2850 kg capacity supporting riser plus water content<\/span><\/li>\n<\/ul>\n<p><b>Commercial HVAC System<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Building:<\/b><span style=\"font-weight: 400\"> Office complex with central chilled water<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Application:<\/b><span style=\"font-weight: 400\"> 4&#8243; chilled water supply riser<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Product:<\/b><span style=\"font-weight: 400\"> NAC-RSC-100 with electro-galvanized finish<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Installation:<\/b><span style=\"font-weight: 400\"> Floor-mounted at each level with thermal expansion accommodation<\/span><\/li>\n<\/ul>\n<p><b>Industrial Process Installation<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Facility:<\/b><span style=\"font-weight: 400\"> Manufacturing plant with process steam<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Application:<\/b><span style=\"font-weight: 400\"> 5&#8243; steam supply vertical run<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Product:<\/b><span style=\"font-weight: 400\"> NAC-RSC-125 with plain finish (customer painting)<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Requirements:<\/b><span style=\"font-weight: 400\"> High-temperature service with insulation consideration<\/span><\/li>\n<\/ul>\n<h2><b>Major Project Installations<\/b><\/h2>\n<p><span style=\"font-weight: 400\">\ufe0f <\/span><b>Egyptian Opera House<\/b><span style=\"font-weight: 400\"> &#8211; Fire protection riser supports in performance halls<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span><span style=\"font-weight: 400\"> \ufe0f <\/span><b>New Capital Residential Towers<\/b><span style=\"font-weight: 400\"> &#8211; HVAC and plumbing riser systems<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span><span style=\"font-weight: 400\"> \ufe0f <\/span><b>Military Complex High-Rise<\/b><span style=\"font-weight: 400\"> &#8211; Multi-story MEP vertical distribution<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span> <b>Upper Egypt Smart Cities<\/b><span style=\"font-weight: 400\"> &#8211; Commercial building mechanical systems<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span> <b>Healthcare Facilities<\/b><span style=\"font-weight: 400\"> &#8211; Medical gas and fire protection risers<\/span><span style=\"font-weight: 400\"><br \/>\n<\/span> <b>Industrial Projects<\/b><span style=\"font-weight: 400\"> &#8211; Process piping vertical runs and equipment connections<\/span><\/p>\n<p><b>Engineering Firm Testimonials<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> &#8220;Direct load transfer eliminates complex hanger rod calculations. Clean installation, reliable performance.&#8221; &#8211; Senior MEP Engineer, Leading Cairo Consultancy<\/span><\/p>\n<p><b>Contractor Feedback<\/b><b><br \/>\n<\/b><span style=\"font-weight: 400\"> &#8220;Two-minute installation per clamp. No ceiling access required. Perfect for tight construction schedules.&#8221; &#8211; Project Manager, Major Egyptian Contractor<\/span><\/p>\n<h2><b>Technical Support &amp; Engineering Services<\/b><\/h2>\n<p><b>Design Assistance<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Load Calculations:<\/b><span style=\"font-weight: 400\"> Pipe weight plus contents, thermal forces, seismic loads<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Structural Requirements:<\/b><span style=\"font-weight: 400\"> Floor loading analysis and bearing area calculations<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Installation Planning:<\/b><span style=\"font-weight: 400\"> Clamp spacing, support elevation, and clearance requirements<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Custom Solutions:<\/b><span style=\"font-weight: 400\"> Special sizes, materials, or configurations for unique applications<\/span><\/li>\n<\/ul>\n<p><b>Project Support Services<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Site Surveys:<\/b><span style=\"font-weight: 400\"> Evaluation of existing structural conditions<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Installation Training:<\/b><span style=\"font-weight: 400\"> Proper procedures for field crews<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Quality Inspection:<\/b><span style=\"font-weight: 400\"> Verification of installation and load transfer<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Technical Documentation:<\/b><span style=\"font-weight: 400\"> As-built drawings and load verification reports<\/span><\/li>\n<\/ul>\n<p><b>Engineering Resources<\/b><\/p>\n<ul>\n<li style=\"font-weight: 400\"><b>Technical Data Sheets:<\/b><span style=\"font-weight: 400\"> Complete specifications and load tables<\/span><\/li>\n<li style=\"font-weight: 400\"><b>CAD Library:<\/b><span style=\"font-weight: 400\"> 2D\/3D models for design integration<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Calculation Templates:<\/b><span style=\"font-weight: 400\"> Structural analysis aids for engineers<\/span><\/li>\n<li style=\"font-weight: 400\"><b>Installation Videos:<\/b><span style=\"font-weight: 400\"> Professional installation techniques and best practices<\/span><\/li>\n<\/ul>","protected":false},"excerpt":{"rendered":"<h4><b>Vertical Pipe Support for Floor-Stacked Systems<\/b><\/h4>\n<h4><b>Engineered for Execution \u2013 Made in &#8230; <\/p>","protected":false},"featured_media":2185,"comment_status":"open","ping_status":"closed","template":"","meta":{"_acf_changed":false},"product_brand":[],"product_cat":[97],"product_tag":[],"class_list":["post-2183","product","type-product","status-publish","has-post-thumbnail","product_cat-fire-fighting-solutions","first","instock","shipping-taxable","product-type-simple"],"acf":[],"_links":{"self":[{"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/product\/2183","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/comments?post=2183"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/media\/2185"}],"wp:attachment":[{"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/media?parent=2183"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/product_brand?post=2183"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/product_cat?post=2183"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/new-ageco.com\/ar\/wp-json\/wp\/v2\/product_tag?post=2183"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}