U-Bolt With Linning

U-BOLT WITH EPDM LINING | Guided Support & Vibration Isolation

Engineered for Movement Control & Noise Reduction – Made in Egypt

New Age U-Bolts with EPDM Lining are designed for securing pipes to structural beams and support frames while providing controlled axial movement and vibration dampening in mechanical piping systems.

The high-density EPDM lining prevents metal-to-metal contact, reducing noise transmission up to 18 dB and protecting pipe surfaces from wear—critical for HVAC systems in occupied buildings, hotels, hospitals, and residential developments.

Specified in the Opera House Rehabilitation, Military Complex MEP installations, and New Giza residential towers, our U-Bolts deliver reliable pipe guidance with extended thread length for easy field adjustment.

Download PDF

Technical Specifications

Feature Details
U-Bolt Material Mild Steel (ASTM A36 Grade) — alternative grades available on request
Lining Material High-density EPDM rubber — temperature range -40°C to +120°C
Noise Reduction Up to 18 dB sound transmission reduction through EPDM isolation
Construction U-Bolt with extended threaded legs + 4 standard hex nuts included
Finish Options • Electro-Galvanized (EG)<br>• Hot-Dip Galvanized (HDG)<br>• Pre-Galvanized (PG)<br>• Plain
Pipe Compatibility DN 15 to DN 600 (½″ to 24″ nominal pipe sizes)
Thread Sizes M8, M10, M12, M16, M20, M24 (depending on pipe diameter)
Movement Type Allows axial thermal expansion/contraction while restricting lateral and vertical displacement
Mounting Options Over-beam (pipe below structure) or under-beam (pipe above structure) configurations
Load Capacity 750 kg to 5,800 kg depending on bolt size and pipe diameter
Manufacturing 100% automated bending and threading — Abu Rawash, Giza
Quality Control ISO 9001:2015 certified with dimensional inspection per batch

Complete Product Range & Dimensional Data

Standard Pipe Sizes (DN 15 – DN 100)

Model Code Pipe Size Pipe OD (mm) Rod Diameter U-Bolt Width (W) U-Bolt Length (L) Lining Thickness (T) Max Load (KG)
NAC-UBL-15 ½″ (DN15) 21.3 M10 21 mm 65 mm 50 mm 750
NAC-UBL-20 ¾″ (DN20) 26.7 M10 27 mm 77 mm 50 mm 750
NAC-UBL-25 1″ (DN25) 33.4 M10 34 mm 85 mm 50 mm 750
NAC-UBL-32 1¼″ (DN32) 42.1 M10 43 mm 93 mm 50 mm 750
NAC-UBL-40 1½″ (DN40) 48.2 M10 48 mm 100 mm 50 mm 750
NAC-UBL-50 2″ (DN50) 60.3 M10 60 mm 110 mm 50 mm 1,250
NAC-UBL-65 2½″ (DN65) 73.0 M12 76 mm 127 mm 50 mm 1,250
NAC-UBL-80 3″ (DN80) 88.9 M12 89 mm 140 mm 50 mm 1,750
NAC-UBL-100 4″ (DN100) 114.3 M12 115 mm 165 mm 50 mm 1,850

Large Pipe Sizes (DN 150 – DN 600)

Model Code Pipe Size Pipe OD (mm) Rod Diameter U-Bolt Width (W) U-Bolt Length (L) Lining Thickness (T) Max Load (KG)
NAC-UBL-150 6″ (DN150) 168.3 M12 168 mm 220 mm 50 mm 2,250
NAC-UBL-200 8″ (DN200) 219.1 M16 219 mm 295 mm 75 mm 2,250
NAC-UBL-250 10″ (DN250) 273.0 M20 273 mm 370 mm 100 mm 3,600
NAC-UBL-300 12″ (DN300) 323.8 M20 324 mm 324 mm 100 mm 3,600
NAC-UBL-400 16″ (DN400) 406.4 M20 406 mm 505 mm 100 mm 4,500
NAC-UBL-500 20″ (DN500) 508.0 M24 508 mm 605 mm 100 mm 4,500
NAC-UBL-600 24″ (DN600) 609.6 M24 610 mm 710 mm 100 mm 5,800

Full dimensional drawings and opening radius charts available for consultant submittal packages.

Why New Age U-Bolts with EPDM Lining?

18 dB Noise Reduction Through EPDM Isolation

The high-density EPDM lining breaks the vibration path between pipe and structure—critical for HVAC systems in hospitals, hotels, and residential buildings where operational noise is a design concern. Unlike bare metal U-bolts that transmit pump vibration and water hammer directly into the building structure, our lined supports deliver measurably quieter mechanical systems.

Precision-Bent with Automated CNC Equipment

Our U-bolts are formed using automated hydraulic bending machines—not manual workshop fabrication. This ensures:

  • Consistent bend radius matching pipe OD exactly
  • Uniform leg spacing for easy beam mounting
  • Parallel threading for smooth nut installation
  • Zero weld defects or stress points

Workshop-fabricated U-bolts often have uneven bends, misaligned legs, and inconsistent EPDM placement. Our automated process eliminates these installation headaches.

Extended Thread Length for Field Adjustment

Unlike standard U-bolts with minimal thread engagement, New Age U-bolts feature extended threaded legs—typically 50mm longer than competitors. This allows:

  • Easier height adjustment during installation
  • Accommodation of thicker structural members
  • Four-nut locking configuration (top and bottom on each leg)
  • Better load distribution across threaded sections

Site engineers appreciate this when dealing with variable beam depths or when final pipe elevation needs adjustment.

In-House Hot-Dip Galvanization

We control the entire galvanization process at our Abu Rawash facility. After forming and threading, U-bolts are pickled, fluxed, and immersed in molten zinc to achieve 85-100 micron coating thickness per ASTM A153. This provides:

  • Superior corrosion protection for 15-20 years in typical conditions
  • Better coating adhesion than outsourced galvanizing
  • Faster turnaround for urgent project needs
  • Consistent finish quality batch-to-batch

️ Pipe Surface Protection

The EPDM lining acts as a protective cushion preventing:

  • Coating damage on pre-insulated pipes
  • Scratching of stainless steel or special alloy piping
  • Galvanic corrosion at dissimilar metal contact points
  • Point loading that can dent thin-wall piping

After-Sales Engineering Support

Direct access to our technical team for:

  • Pipe support spacing calculations per Egyptian Mechanical Code
  • Guidance on restraint vs. guide point placement
  • Thermal expansion movement verification
  • On-site installation coordination with your MEP contractor

We don’t just supply U-bolts—we help you design the complete piping support system correctly.

System Application & Movement Control

Configuration 1: Pipe Below Structural Member (Standard Suspension)

Function:

  • U-bolt provides vertical support against pipe weight and fluid load
  • Restricts horizontal and lateral movement at guide points
  • Allows axial thermal expansion/contraction along pipe axis

Typical Use:

  • Overhead HVAC piping in mechanical rooms
  • Fire sprinkler distribution mains
  • Chilled water loop suspension
  • Process piping in industrial facilities

Installation: U-bolt legs pass downward through beam flange or mounting plate. Upper nuts set elevation. Lower nuts lock assembly.

Configuration 2: Pipe Above Structural Member (Uplift Restraint)

Function:

  • U-bolt prevents uplift (pipe trying to float above support)
  • Restricts lateral shifting at restraint points
  • Still allows axial pipe movement for thermal expansion

Typical Use:

  • Underground or basement piping with buoyancy concerns
  • Systems with significant thermal rise creating uplift forces
  • Pump discharge lines subject to water hammer
  • Seismic bracing anchor points

Installation: U-bolt legs pass upward through beam bottom flange or bracket. Assembly pulls pipe down against structural member.

Noise & Vibration Control

The EPDM Advantage:

  • Absorbs high-frequency vibration from pumps, valves, and flow turbulence
  • Reduces structure-borne noise transmission by up to 18 dB
  • Prevents resonance amplification through building frame
  • Maintains acoustic comfort in occupied spaces

Critical Applications:

  • Hotel room corridors with overhead HVAC piping
  • Hospital patient areas requiring low ambient noise
  • Residential buildings with mechanical systems above living spaces
  • Recording studios, theaters, and acoustic-sensitive facilities

Application Guide by System Type

System Type Pipe Size Range Recommended Finish U-Bolt Function
HVAC Chilled Water (CHW) 2″ – 12″ Hot-Dip Galvanized Suspension + noise isolation in mechanical rooms
HVAC Hot Water (HHW) 2″ – 8″ Hot-Dip Galvanized Suspension with allowance for thermal expansion
Fire Sprinkler Mains 4″ – 8″ Hot-Dip Galvanized Guide points restricting lateral movement
Condenser Water Lines 6″ – 12″ Hot-Dip Galvanized Heavy-duty suspension in outdoor pipe racks
Domestic Water Distribution ½″ – 2″ Electro-Galvanized Riser supports in residential buildings
Steam & Condensate 2″ – 6″ Hot-Dip Galvanized High-temperature guide supports (EPDM rated to 120°C)
Industrial Process Piping 6″ – 24″ Hot-Dip Galvanized Heavy pipe rack installations with vibration isolation

Installation Guidelines

Structural Requirements

  1. Verify Beam Capacity: Confirm structural member can support pipe weight + fluid load + safety factor
  2. Hole Spacing: Drill holes in beam flange matching U-bolt leg spacing (see dimensional table)
  3. Expansion Analysis: Identify fixed anchor points and guide points in piping stress calculation
  4. Thermal Movement: Ensure U-bolt does not over-restrict axial expansion at guide locations

Installation Procedure

Step 1: Position U-Bolt

  • Place U-bolt around pipe ensuring EPDM lining makes full 360° contact with pipe OD
  • Verify pipe sits centered in U-bolt opening (not tilted or offset)

Step 2: Insert Through Support

  • Pass threaded legs through pre-drilled holes in beam flange, mounting plate, or pipe rack
  • Ensure legs are perpendicular to mounting surface

Step 3: Set Elevation (if pipe suspended below beam)

  • Install hex nuts on top side of beam flange
  • Tighten evenly to set pipe elevation and transfer load to structure
  • Use level or laser to verify pipe slope meets design requirements

Step 4: Lock Assembly

  • Install hex nuts on bottom side of beam flange
  • Tighten against beam to lock U-bolt position and prevent loosening from vibration
  • Four-nut configuration (two per leg) provides maximum stability

Step 5: Final Torque

  • Apply torque gradually and evenly on all four nuts
  • Do not over-compress EPDM lining — finger-tight plus ¼ turn is typically sufficient
  • Over-torquing reduces EPDM cushioning effect and can damage lining

Important Installation Notes

  • For high-vibration systems (pump discharge, compressor piping), verify nuts are fully locked
  • At pipe guide points, allow small clearance (1-2mm) for axial sliding movement
  • At restraint points, snug U-bolt firmly but do not crush EPDM excessively
  • Inspect EPDM lining after installation—it should be compressed but not extruded from U-bolt

Finish Selection Guide

Choose the appropriate corrosion protection based on installation environment:

Finish Type Corrosion Resistance Best For Service Life
Hot-Dip Galvanized (HDG) Excellent • Outdoor pipe racks<br>• Mechanical plant rooms<br>• High-humidity areas<br>• Coastal installations 15-20 years typical
Electro-Galvanized (EG) Good • Indoor conditioned spaces<br>• Residential buildings<br>• Dry environments 5-10 years typical
Pre-Galvanized (PG) Moderate • Indoor dry installations<br>• Temporary supports<br>• Budget-sensitive projects 3-5 years typical
Plain (Uncoated) Minimal • Short-term use only<br>• Indoor dry locations<br>• Immediate painting planned 1-2 years typical

Most Specified: Hot-Dip Galvanized for HVAC, firefighting, and all outdoor MEP systems.

Proven Performance on Major Projects

New Age U-Bolts with EPDM Lining have been specified and installed in:

Opera House Rehabilitation Project — Complete HVAC and firefighting pipe support systems
Military Complex Infrastructure — Mechanical and fire protection installations
New Giza Residential Towers — HVAC distribution with acoustic isolation requirements
205 Project, Sheikh Zayed — Recommended by consulting engineer for noise control
Multiple Hospitality Projects — Hotels requiring low mechanical system noise

Trusted by Egypt’s top contractors: Orascom Construction, Hassan Allam, and leading MEP subcontractors.

Standards & Code Compliance

New Age U-Bolts are manufactured and tested in accordance with:

  • MSS SP-58 — Pipe hangers and supports – materials, design, manufacture, selection, application, and installation
  • Egyptian Mechanical Code — Pipe support spacing, restraint, and load requirements
  • ASTM A36 — Structural steel specification for U-bolt material
  • ASTM A153 — Hot-dip zinc coating specification (galvanized finishes)
  • ASTM B633 — Electrodeposited coatings of zinc on iron and steel
  • ISO 9001:2015 — Quality management system certification (New Age factory)

Test certificates, material certifications, and dimensional inspection reports available for consultant approval and project submittal packages.

Technical Support & Engineering Services

Our team provides:

Pipe Support Design Assistance:

  • Support spacing calculations per Egyptian Mechanical Code requirements
  • Restraint vs. guide point placement in thermal expansion analysis
  • Load verification for beam capacity and U-bolt sizing
  • Seismic bracing anchor point coordination

Installation Support:

  • Dimensional drawings and mounting detail CAD files
  • On-site coordination with MEP contractors when needed
  • Torque specifications for proper EPDM compression
  • Troubleshooting for fit or alignment issues

Submittal Preparation:

  • Technical data sheets with dimensional specifications
  • Material certifications and test reports
  • Factory ISO 9001:2015 quality certificate
  • Product catalog sheets for consultant approval

Compatible Products & Complete Support Systems

U-Bolts with EPDM Lining work as part of a complete pipe support assembly. Consider these complementary New Age products:

Threaded Rods — Vertical suspension elements (M8 to M24)
Beam Clamps — No-weld attachment to structural steel
Pipe Hangers — Adjustable clevis and split ring designs
Strut Channels — Trapeze and multi-pipe support frames
Rod Couplers — For extending threaded rod lengths

Complete MEP support solutions from a single Egyptian manufacturer.

New Age 

Supporting What Builds the Future.

Certified. Tested. Trusted by Egypt’s top contractors and consultants.

المراجعات

لا توجد مراجعات بعد.

كن أول من يقيم “U-Bolt With Linning”

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

المراجعات

لا توجد مراجعات بعد.

كن أول من يقيم “U-Bolt With Linning”

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *